• Welcome to Hydropower Lifecycle Support Platform
To
12 Aug 2025

The 22nd hydroelectric grid, designed and supervised by Units Engineering,

Kathmandu Units Engineering Connects 22nd Hydropower Project to National Grid The 5 MW Buku Kapte Hydropower Project, designed an...

12 Aug 2025

Finally, the contract for the 106 MW Jagadulla project has been completed.

Kathmandu Construction Contract Finalized for 106 MW Jagadulla Hydropower Project in Dolpa The long-awaited construction contract...

11 Aug 2025

Nepal-Australia relations at 65 years: Unanimity on green energy and new possibilities for cooperation

Kathmandu Energy Minister Deepak Khadka Meets Australian Ambassador; Discusses Bilateral Cooperation in Renewable Energy and Hydropo...

07 Aug 2025

10 banks and financial institutions invest Rs 52.5 billion in 341 MW Budhi Gandaki

Kathmandu Investment Finalized for 341 MW Budhi Gandaki Hydropower Project Led by Private Sector In a significant boost to Nepal&...

07 Aug 2025

Separate insurance policy required for hydropower sector

Kathmandu Nepal Insurance Authority Hosts Stakeholder Discussion on Hydropower Insurance Reforms The Nepal Insurance Authority or...

25 Jul 2025

Commercial production to begin from Lower Solu within two weeks

Kathmandu – The 82 MW Lower Solu Hydropower Project, the second-largest project developed by a private company in Nepal, is expec...

24 Jul 2025

Daramkhola to issue shares from July 15

Kathmandu. Daramkhola Hydro Energy Limited is going to issue shares to the general public from 15th of Shrawan. The company is going to...

23 Jul 2025

Synergy Power investing in Central Hongu 'A' and 'B'

Kathmandu. Synergy Power Development Limited is going to invest in two hydropower projects. The company has decided to invest in M...